Production Meetings

Production meetings take place 4 to 6 weeks before performance with the technical staff of the performance space being used. For example, if this was the Studio at Harrogate Theatre, a meeting would be arranged with the following:-

  • Director of the play
  • HDS stage builder(s)
  • Theatre technical staff

Discussions would be about:-

  • Get in and get out days – times for both get in and out, and staff who would be working with HDS.
  • Lighting
    • Who will be available to re-rig the lighting if necessary
    • Any special lighting effects that need to be supplied (such as gobo, strobe etc)
    • Who will operate the cue’s for the lighting – will this be the HDS SM or the theatre?
  • Sound
    • How will sound be connected and produced?
      • Will the theatre use a connection directly from the ipad?
      • Will the theatre transfer the sound onto their own system and if so, who will do this?
      • If sound effects are required from certain areas of the stage – will there be speakers available to do this?
      • Who will operate the cue’s for sound – will this be HDS SM or the theatre?